Monday, December 13, 2010

black out.

reclaimed barn siding
The building wrap (vaproshield) is on and we are getting ready to put the siding on.  Weathered barn siding on one side and corrugated metal on the other.  All the tpo (white) roofing will be cover with a vegetated roof system http://en.wikipedia.org/wiki/Green_roof in the spring.  

Friday, November 26, 2010

Wednesday, July 21, 2010

construction drawings are submitted for permit... and the excavator is ready to dig in two weeks!!!

Monday, July 12, 2010

a423 architecture & design (Lot 6)

Construction journal for the Lot 6 house in Moore Township, PA.

Maria Diaz-Joves & Ryan Welty @ a423 architecture & design have been working hard on the design of this house for quite some time and it may soon be ready for construction.

Today the drawings will be submitted for the sewer & driveway permits and soon to follow will be the construction permit drawings.